Analysis of Chandrayaan-2
Analysis of Chandrayaan-2
Today's blog is based on"Analysis of Chandrayaan-2".Mission Chandrayaan-2 is the second lunar exploration mission developed by the Indian Space Research Organisation (ISRO), after Chandrayaan-1. It consisted of a lunar orbiter, the Vikram lander, and the Pragyan lunar rover, all of which were developed in India. The main scientific objective is to map and study the variations in lunar surface composition, as well as the location and abundance of lunar water.
The spacecraft was launched on its mission to the Moon from the second launch pad at the Satish Dhawan Space Centre on 22 July 2019 at 2.43 PM IST (09:13 UTC) by a Geosynchronous Satellite Launch Vehicle Mark III (GSLV Mk III). The craft reached the Moon's orbit on 20 August 2019 and began orbital positioning maneuvers for the landing of the Vikram lander. Vikram and the rover were scheduled to land on the near side of the Moon, in the south polar region at a latitude of about 70° south at approximately 20:23 UTC on 6 September 2019 and conduct scientific experiments for one lunar day, which approximates two Earth weeks.
However, the lander deviated from its intended trajectory starting at 2.1 kilometers (1.3 mi) altitude and had lost communication when touchdown confirmation was expected. Initial reports suggesting a crash have been confirmed by ISRO chairman K. Sivan, stating that "it must have been a hard landing".
Both ISRO and NASA tried unsuccessfully to communicate with the lander for two weeks before the lunar night set in. The orbiter, part of the mission with eight scientific instruments, remains operational and is expected to continue its seven-year mission to study the Moon. The primary objectives of the Chandrayaan-2 lander were to demonstrate the ability to soft-land on the lunar surface and operate a robotic rover on the surface. Scientific goals include orbital studies of lunar topography, mineralogy, elemental abundance, the lunar exosphere, and signatures of hydroxyl and water ice. The orbiter will map the lunar surface and help to prepare 3D maps of it. The onboard radar will also map the surface while studying the water ice in the south polar region and thickness of the lunar regolith on the surface.
ISRO selected eight scientific instruments for the orbiter, four for the lander, and two for the rover. While it was initially reported that NASA and ESA would participate in the mission by providing some scientific instruments for the orbiter, ISRO in 2010 had clarified that due to weight restrictions it will not be carrying foreign payloads on this mission. However, in an update, just a month before launch,[89] an agreement between NASA and ISRO was signed to include a small laser retroreflector from NASA to the lander's payload to measure the distance between the satellites above and the micro reflector on the lunar surface.
Chandrayaan-2 launch was initially scheduled for 14 July 2019, 21:21 UTC (15 July 2019 at 02:51 IST local time). However, the launch was aborted 56 minutes and 24 seconds before launch due to a technical glitch, so it was rescheduled to 22 July 2019. Unconfirmed reports later cited a leak in the nipple joint of a helium gas bottle as the cause of cancellation.
Finally, Chandrayaan-2 has launched onboard the GSLV MK III M1 launch vehicle on 22 July 2019 at 09:13 UTC (14:43 IST) with better-than-expected apogee as a result of the cryogenic upper stage being burned to depletion, which later eliminated the need for one of the apogee-raising burns during the geocentric phase of the mission. This also resulted in the saving of around 40 kg of fuel onboard the spacecraft.
Immediately after launch, multiple observations of a slow-moving bright object over Australia were made, which could be related to upper stage venting of residual LOX/LH2 propellant after the main burn. The mission's orbiter was reported to have imaged the location of the lander. Unconfirmed reports, citing an ISRO official, stated that the lander was intact, but there has been no official announcement by ISRO on the lander's actual location or physical condition. ISRO's Chairman, K. Sivan, tasked senior scientist P. S. Goel to head the Failure Analysis Committee to look into the causes of the failure.
Both ISRO and NASA attempted to communicate with the lander for about two weeks before the lunar night set in, while NASA's Lunar Reconnaissance Orbiter (LRO) flew over on 17 September 2019 and acquired some images of the intended landing zone. However, the region was near dusk, causing poor lighting for optical imaging. NASA's LRO images, showing no sight of the lander, were released on 26 September. The LRO flew over again on 14 October under more favorable lighting conditions but was unable to locate it. The LRO will perform another flyover on November 10. The orbiter part of the mission, with eight scientific instruments, remains operational and will continue its seven-year mission to study the Moon.
If you like my blog please share my blog with your friends.
for my next blog stays tuned.
for suggestion kindly reach me out :
mail id: arpitmishra1629.ftp@gmail.com
Contact no: 8127430702
follow me on Instagram: @arpit_mishra29999
Knowledgeable
ReplyDeleteThank you.
Delete